ISRO Set to Launch India’s New Military SatCom Backbone

army coms

ISRO Set to Launch GSAT-7R on Nov 2: India’s New Military SatCom Backbone

The Indian Space Research Organisation will launch the CMS-03 (GSAT-7R) satellite on November 2, 2025, via LVM3 from Sriharikota — a dedicated military communication asset designed to replace the aging GSAT-7 and enable secure, jam-resistant tri-service operations.

Mission Overview and Launch Schedule

On November 2, 2025, at 21:58 IST, the Indian Space Research Organisation (ISRO) will execute the LVM3-M5 mission from the Second Launch Pad at Satish Dhawan Space Centre, Sriharikota. The primary payload is the Communication-Centric Military Satellite-03 (CMS-03), officially designated GSAT-7R by the Indian Navy.

This will be the 10th flight of the LVM3 rocket and the 100th launch from Indian soil. The 43.5-meter-tall, 643-tonne vehicle will place the 4,500 kg satellite into a Geosynchronous Transfer Orbit (GTO) with apogee of 36,000 km and perigee of 170 km. Post-separation, GSAT-7R will use its onboard liquid apogee motor for circularization into Geostationary Orbit at 48° East.

GSAT-7R: Technical Specifications

Built on ISRO’s enhanced I-4K bus, GSAT-7R is a multi-band, software-defined communication satellite with the following configuration:

  • Total mass: 4,525 kg (including 2,650 kg propellant)
  • Power generation: 11.5 kW (dual solar arrays)
  • Design life: 14 years
  • Transponders: 32 (UHF, S-band, Ku-band, Ka-band)
  • Beam coverage: Indian mainland, island territories, maritime zone up to 2,000 km from coast
  • Anti-jamming features: Frequency hopping, nulling antennas, encrypted uplinks

The satellite replaces GSAT-7 (launched 2013), which reaches end-of-life in 2027. GSAT-7R offers 3x higher bandwidth and 50% greater coverage footprint than its predecessor.

Payload Breakdown and User Allocation

Band Transponders Primary User Application
UHF 12 Indian Navy Ship-to-ship, ship-to-shore voice/data
S-band 8 Indian Army Mobile user terminals, tactical comms
Ku-band 8 Indian Air Force UAV data links, airborne relay
Ka-band 4 Joint (Tri-service) High-speed secure data, video conferencing

Strategic Importance for Network-Centric Warfare

GSAT-7R forms the orbital backbone of India’s evolving network-centric warfare architecture. Key operational enhancements include:

  • Real-time beyond-line-of-sight (BLOS) communication for naval task forces in IOR
  • Integration with IACCS (IAF’s automated air defence system)
  • Support for Army’s BMS (Battlefield Management System) via SATCOM-on-the-move terminals
  • Secure video feeds from MQ-9B drones and P-8I aircraft
  • Disaster-resistant backup for terrestrial fibre networks

The satellite enables seamless data flow between forward troops in Ladakh, naval assets in the Gulf of Aden, and command centers in New Delhi — all on a single encrypted platform.

Anti-Jamming and Electronic Warfare Resilience

Designed with lessons from recent conflicts, GSAT-7R incorporates advanced EW countermeasures:

  • Smart antenna arrays with digital beamforming to nullify jamming sources
  • Frequency hopping spread spectrum (FHSS) across 500+ channels
  • Onboard signal processing to detect and isolate spoofed uplinks
  • Redundant control stations at Hassan (primary) and Bhopal (backup)

DRDO’s Defence Electronics Research Laboratory (DLRL) contributed the secure modem and encryption modules, certified to MIL-STD-1553 standards.

Launch Vehicle: LVM3 Reliability

The LVM3 (formerly GSLV Mk III) has a 100% success rate in its last six flights. For this mission:

  • C25 cryogenic upper stage with CE-20 engine (200 kN thrust)
  • Dual Vikas engine core stage (L110)
  • Two S200 solid boosters
  • Payload fairing: 5m diameter ogive

Pre-launch reviews completed on October 27, 2025. The 72-hour countdown begins October 30.

Ground Segment and User Terminals

The Indian Navy’s SATCOM hub at INS Kattabomman (Tirunelveli) will serve as the primary gateway. Over 1,200 military terminals have been fielded:

  • Manpack UHF terminals for infantry battalions
  • Vehicle-mounted S-band systems for artillery units
  • Ku-band flyaway terminals at air bases
  • Ka-band hubs at tri-service HQs

Bharat Electronics Limited (BEL) delivered the last batch of 300 terminals in September 2025.

Cost and Indigenous Content

Program cost: approximately 2,800 crore rupees, including:

  • Satellite development: 1,600 crore
  • Launch services: 600 crore
  • Ground infrastructure upgrade: 400 crore
  • User terminals: 200 crore

Indigenous content stands at 78% by value — up from 62% in GSAT-7. Key local contributions include solar arrays (ISRO), TT&C systems (SAC Ahmedabad), and encryption hardware (DLRL Hyderabad).

Future Roadmap: CMS Series Expansion

GSAT-7R is the third in the CMS series:

  1. CMS-01 (GSAT-7) – Navy (2013)
  2. CMS-02 (GSAT-7A) – IAF (2018)
  3. CMS-03 (GSAT-7R) – Navy replacement (2025)
  4. CMS-04 – Planned Army-dedicated (2028)

A unified tri-service SATCOM constellation with 6–8 satellites is targeted by 2035.

Global Context

China operates over 12 dedicated military SATCOM birds (including Shentong series). The US WGS constellation has 10 operational satellites. GSAT-7R keeps India competitive in space-based C4ISR while maintaining strategic autonomy.

Conclusion

The November 2 launch of GSAT-7R is more than a routine ISRO mission. It is a milestone in India’s transition from a space-faring nation to a space power with military utility. When the satellite reaches station in December 2025, it will bind the Indian armed forces with an invisible but unbreakable thread of secure communication — from the Himalayas to the high seas.

As the LVM3 roars into the night sky, it carries not just a satellite, but the future of tri-service integration.

Leave a Comment

Your email address will not be published. Required fields are marked *